“Wholesale and Distribution Center Novorossiysk” is a modern container terminal with the possibility of simultaneous placement of 4000 TEUs.
The terminal is equipped with a platform for storing and servicing loaded and empty refrigerated containers, with the possibility of connecting 500 units to sockets at a time, container platforms for storing dry loaded and empty containers. Also at the Terminal there is a cold shearing warehouse 432 square meters. m. With the maintenance of various temperature modes from + 4 to + 8, a refueling platform, car scales for weighing containers. The territory is fenced, video surveillance systems are installed. The Terminal has modern transshipment equipment: RTG crane, 2 ricstrakers, 2 electric cars.
The Terminal has modern reloading equipment: 2 electric cars, 2 SANY SRSC45H1 ricehackers – Lifting capacity: 45t/31t/15t, 3 forklifts, TCM-FB18-8 – 1750 kg, TCM-FB15-8 – 1500 kg, RTG crane – 10t, RTG goat crane manufactured by Baltkran JSC.